About Us

 

Our Development Timeline

1992 Tamworth Scaffolding Established

Tamworth Scaffolding was established, with their 1st large project Ventura Retail Park, Tamworth which consisted of access scaffold for the construction of the new Ventura Retail Park, the Snowdome then followed on where we still carry out works to the present day.

Tamworth Scaffolding

1995 St Marys Church Lichfield

Our first heritage project was a full wrap around the main body of the church for roofing works and stone repairs, following on from the success of this project Tamworth Scaffolding Co Ltd started to specialise in this particular field.

Tamworth Scaffolding

2003 St Martin's Church, Birmingham

Now being well established in the heritage sector we were chosen to carry out the full scaffolding package on this high-profile project, which was part of the redevelopment of the Bullring.

Tamworth Scaffolding

2009 Coventry Cathedral

In 2009 The team were busy on heritage projects around the Midland region, most notably working on the remains of Coventry Cathedral, which was destroyed in the blitz of WW2, and also a large church project in Radford Seleme which was the victim of an arson attack.

Tamworth Scaffolding

2010 NASC

In 2010 Tamworth Scaffolding Co Ltd became full contracting members of the NASC and continue to be up to the present day.

Tamworth Scaffolding

2012 Mustique, Caribbean

An amazing opportunity came to work on one of the Caribbean islands, Tamworth Scaffolding Co Ltd continued to do work in Mustique for a further 4 years.

Tamworth Scaffolding

2015 Derby Cathedral

2015 brought more success in the heritage sector with a large project at Derby Cathedral which was carried out over 3 phases:

  • A full internal birdcage
  • A designed temporary roof over the main body of the Church
  • A designed access scaffold for replacement of the flagpole

Tamworth Scaffolding

2015 RSC Stratford Upon Avon

2015 also saw us carry out another large-scale temporary roof over the grade 1 listed Swan Wing Theatre at RSC Stratford Upon Avon.

Tamworth Scaffolding

2018 Falcon Hotel

Following on from the success of our project at The Swan Wing RSC we were selected to carry out the scaffolding works for the redevelopment of the grade 2 listed Falcon Hotel (now Hotel Indigo) in the centre of Stratford Upon Avon.

Tamworth Scaffolding

2019 Newstead Abbey

With our expertise in the heritage sector now very well established we were selected after competitive tender to design and erect a free-standing mason’s scaffold complete with lifting rigs to this scheduled ancient monument.

Tamworth Scaffolding

2022 Wireless Music Festival

The popular music festival Wireless had the team working on the erection of numerous public access staircases on a tight deadline for access and egress for festival goers! From Crystal Palace Park the team travelled to Alexander Palace, London and erected another public access staircase for the renowned Red Bull Soapbox Race.

Tamworth Scaffolding

2024 Middleton Hall

We have been working at Middleton Hall on and off for the last 20 years, but this was our largest project to date ‘Restoration of the Great Hall roof’. The project consisted of a freestanding designed access scaffold and HAKI temporary roof. Another grade 2 listed building to add to Tamworth Scaffolding's portfolio of heritage projects over the last 30 years.

Tamworth Scaffolding

2024 St Peters Church Wolverhampton

St Peters Church Wolverhampton

Full designed masons scaffolding for major stone repairs to the chancel over a 12-month period.

Tamworth Scaffolding

2025 The Future

We look forward to many more years of providing the best scaffolding services for all our clients.